Move Teams between Buildings Last updated Save as PDF << Move Teams between Floors Move Teams using the VBS Scratch Pad >> You can move teams from floor to floor (or to the scratch pad) within a building. Complete the following steps. Step 1. Move the team(s) to the building and floor (or the other building's scratch pad) To move the teams can be completed via: Drag and drop the team(s) to the Drop Target Select the teams(s) and then click teh Drop Target Drag and Drop the Team(s) to the Drop Target From the stack select one team or multiple teams, or change the Group By to an Org Unit Level. Click and drag and drop the team(s) to the Other Buildings drop target. Select the Team(s) and then click the Drop Target From the stack select one team or multiple teams, or change the Group By to an Org Unit Level. Click the Other Buildings drop target. Step 2. Complete the Move teams to another building form The Move teams to another building form displays. From the Location section, either select a building's floor, building's scratch pad. or a floor's neighborhood. Click the Move Teams button. This will move the team on the stack in the destination building and floor (or scratch pad). Step 3. Block the team(s) Navigate to the destination building. Find the team(s) on either: the floor on the scratch pad. Refer to Move Teams using the VBS Scratch Pad. Block the team(s) onto their new floor, refer to the VBS Blocking Toolbar.
Move Teams using the VBS Scratch Pad >> You can move teams from floor to floor (or to the scratch pad) within a building. Complete the following steps. Step 1. Move the team(s) to the building and floor (or the other building's scratch pad) To move the teams can be completed via: Drag and drop the team(s) to the Drop Target Select the teams(s) and then click teh Drop Target Drag and Drop the Team(s) to the Drop Target From the stack select one team or multiple teams, or change the Group By to an Org Unit Level. Click and drag and drop the team(s) to the Other Buildings drop target. Select the Team(s) and then click the Drop Target From the stack select one team or multiple teams, or change the Group By to an Org Unit Level. Click the Other Buildings drop target. Step 2. Complete the Move teams to another building form The Move teams to another building form displays. From the Location section, either select a building's floor, building's scratch pad. or a floor's neighborhood. Click the Move Teams button. This will move the team on the stack in the destination building and floor (or scratch pad). Step 3. Block the team(s) Navigate to the destination building. Find the team(s) on either: the floor on the scratch pad. Refer to Move Teams using the VBS Scratch Pad. Block the team(s) onto their new floor, refer to the VBS Blocking Toolbar.