SVLive2 Implementation
Use the following list to ensure you have completed the implementation.
No. |
Item |
Prerequisites |
Responsible |
---|---|---|---|
1 |
Floorplans - Submit New CAD Floorplans
|
None |
Client |
2 |
Floorplans - Drafting and Mapping
|
Floorplans - Submit New CAD |
Serraview Support team |
3 |
Floorplans - Set up Workpoints and Spaces
|
Floorplans - Drafting and Mapping |
Client |
4 |
Client Infrastructure - Network Rules
|
None |
Client Networks team |
5 |
SVLive2 Configuration - Floor Level Switches
|
None |
Client Networks team |
6 |
SVLive2 Installation SVLive Presence Service (SPS) Installation Switch Scanner Service |
Steps 1 to 5 | Client IT |
7 |
Wi-Fi SVLive obtains Wi-Fi data from Serraview's Wi-Fi Location Service.
|
Floorplans |
Client IT / Client Property |
8 |
Wire up - Test and Validate Serraview's Wireup Tool allows non-technical auditors to quickly and accurately audit locations to connect (or "wire-up") switch ports to their physical locations. Before you schedule the wire up, test the wire up of one desk per floor and validate the switch details. For information on the wire up configuration and prerequisites, review the entire section of SVLive and Wireup Configuration. Use the Wire-up Workpoints Manual - Checklist to ensure you are ready to send your auditors out to wire-up a space. Wire up - Workpoints Manually Complete the wire up for all workpoints on each new floor. For information on how to wire up the workpoint manually and the prerequisites, review the entire section of Wireup Workpoints Manually. Also, you can watch the Using the Wire-up Tool Video. |
Floorplans and Switches |
Client IT / Client Property |